242 results containing "hydroelectric power plants"
Larger image available anywhere (242)
|
Larger image available only at the Library of Congress
|
Not Digitized
-
101.
Mill Creek 2 and 3 Hydroelectric Systems, Mill Creek 2 and 3 Cottage Potable Water Tank, Mill Creek, Yucaipa, San Bernardino County, CA
Documentation compiled after 1968 | Photo(s): 2, Data Page(s): 6, Photo Caption Page(s): 2 | Historic American Engineering Record
HAER CA-2272-X -
102.
Mill Creek 2 and 3 Hydroelectric Systems, H.H. Sinclair Monument, Highway 38, 7 miles East of Mentone, Yucaipa, San Bernardino County, CA
Documentation compiled after 1968 | Photo(s): 2, Data Page(s): 11, Photo Caption Page(s): 2 | Historic American Engineering Record
HAER CA-2272-Y -
103.
San Gorgonio Hydroelectric System, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 3, Data Page(s): 26, Photo Caption Page(s): 3 | Historic American Engineering Record
HAER CA-2278 -
104.
San Gorgonio Hydroelectric System, East Fork Dam and Intake, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 8, Data Page(s): 11, Photo Caption Page(s): 6 | Historic American Engineering Record
HAER CA-2278-A -
105.
San Gorgonio Hydroelectric System, South Fork Dam and Intake, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 3, Data Page(s): 13, Photo Caption Page(s): 2 | Historic American Engineering Record
HAER CA-2278-B -
106.
San Gorgonio Hydroelectric System, Powerhouse No. 1, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 11, Data Page(s): 16, Photo Caption Page(s): 4 | Historic American Engineering Record
HAER CA-2278-C -
107.
San Gorgonio Hydroelectric System, Tank No. 1 and Penstock No. 1, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 1, Data Page(s): 13, Photo Caption Page(s): 3 | Historic American Engineering Record
HAER CA-2278-D -
108.
San Gorgonio Hydroelectric System, Operator's Bungalow, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 13, Data Page(s): 10, Photo Caption Page(s): 4 | Historic American Engineering Record
HAER CA-2278-E -
109.
San Gorgonio Hydroelectric System, Operator's Garage, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 5, Data Page(s): 9, Photo Caption Page(s): 3 | Historic American Engineering Record
HAER CA-2278-F -
110.
San Gorgonio Hydroelectric System, Powerhouse No. 2, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 13, Data Page(s): 16, Photo Caption Page(s): 4 | Historic American Engineering Record
HAER CA-2278-G -
111.
San Gorgonio Hydroelectric System, Flowline No. 2, Tank No. 2, & Penstock No. 2, San Bernardino National Forest, Banning, Riverside County, CA
Documentation compiled after 1968 | Photo(s): 8, Data Page(s): 17, Photo Caption Page(s): 5 | Historic American Engineering Record
HAER CA-2278-H -
112.
Bishop Creek Hydroelectric System, Hillside Dam, Spanning the South Fork of Bishop Creek, Bishop, Inyo County, CA
Documentation compiled after 1968 | Photo(s): 24, Data Page(s): 19, Photo Caption Page(s): 3 | Historic American Engineering Record
HAER CA-145-7 -
113.
Bishop Creek Hydroelectric System, Plant 2, Powerhouse No. 2, Bishop Creek, Bishop, Inyo County, CA
Documentation compiled after 1968 | Photo(s): 23, Data Page(s): 31, Photo Caption Page(s): 5 | Historic American Engineering Record
HAER CA-145-2-B -
114.
Bishop Creek Hydroelectric System, Plant 3, Powerhouse No. 3, Bishop Creek, Bishop, Inyo County, CA
Documentation compiled after 1968 | Photo(s): 23, Data Page(s): 33, Photo Caption Page(s): 5 | Historic American Engineering Record
HAER CA-145-3-A -
115.
Bishop Creek Hydroelectric System, Plant 4, Powerhouse No. 4, Bishop Creek, Bishop, Inyo County, CA
Documentation compiled after 1968 | Photo(s): 25, Data Page(s): 38, Photo Caption Page(s): 5 | Historic American Engineering Record
HAER CA-145-4-J -
116.
Ames Hydroelectric Plant, Ames, San Miguel County, CO
Documentation compiled after 1968 | Photo(s): 10, Data Page(s): 3, Photo Caption Page(s): 1 | Historic American Engineering Record
HAER COLO,57-AMES.V,2A- -
117.
Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Glenwood Springs, Garfield County, CO
Documentation compiled after 1968 | Photo(s): 38, Data Page(s): 28, Photo Caption Page(s): 4 | Historic American Engineering Record
HAER COLO,23-GLENS.V,1- -
118.
Phoenix Mill, North bank of Still River, Phoenixville, Windham County, CT
Documentation compiled after 1968 | Photo(s): 21, Measured Drawing(s): 7, Data Page(s): 6, Photo Caption Page(s): 1 | Historic American Engineering Record
HAER CONN,8-PHOE,1- -
119.
Dayville Mills Hydroelectric Facility, North side of Route 101, .5 mile west of Route 395, Killingly Center, Windham County, CT
Documentation compiled after 1968 | Photo(s): 2, Data Page(s): 12, Photo Caption Page(s): 3 | Historic American Engineering Record
HAER CONN,8-KILL,1- -
120.
Norwich Water Power Company, West bank of Shetucket River beginning opposite Second Street & extending .8 mile northward, Greenville section, Norwich, New London County, CT
Documentation compiled after 1968 | Photo(s): 3, Data Page(s): 18, Photo Caption Page(s): 2 | Historic American Engineering Record
HAER CONN,6-NOR,21-
|
|
|